Plot: Traversing some of the highest terrains in the world, the Qinghai-Tibet Railway, in service since July 2006, makes the 4,064-kilometer trip from Beijing to Lhasa in 48 hours. It climbs to an ear-popping altitude of 5,072 meters above sea level passing through several tunnels that had to be carved out of frozen soil